Hydroelectric project Zemplínska Šírava
For the hydroelectric project Zemplínska Šírava – Zalužice we have realized production and installation of the main safety closure segment with the dimensions 12,5 x 4 m and weight 19,5 t. The realisation was with modification and refurbishment of the drives and controls. Listed supply of the machine parts was realised for the main supplier of the construction ISTROMETAL a.s. Košice. In the year 2002, we have realised as sub-delivery for the company Istrometal a flood-gate in Jenkovice and also a sub-delivery of machine parts VD Vyšná Rybnica.
In the year 2005 we have produced and deliver the 2 dumping and closing steel segments with dimensions 12 x 3 m and another stop logs for hydroelectric project Zemplínska Šírava – Petrovany, where we have succesfully applied for the whole machine parts included hydroelectric drives and central controls.